国产最近精品自在自线_国产剧情麻豆精品免费_国产精品不卡在线观看的a站_亚州中文字幕无码中文字幕 久久一级免费电影_毛片在线免费观看网站不卡_国产aⅴ一区二区三区_蜜桃AV秘 无码一区二区三区

Home  /  News  /  Industry News
Industry News
Time:2019-03-21 09:47:20

China-Russia natural gas pipeline will possibly go live one month in advance


Recently during the national two sessions, Wang Yilin, chairman of China national petroleum corporation (CNPC) and a member of the national committee of the Chinese people's political consultative conference (CPPCC), told reporters that the China-Russia natural gas pipeline will be put into operation about one month in advance.


In May 2014, China and Russia signed a natural gas purchase and sales contract for the eastern route with a total value of more than $400 billion and an annual gas supply of 38 billion m3 with a term of up to 30 years.


The east China-Russia natural gas pipeline project starts from the border of China and Russia in Heihe city, Heilongjiang province. It passes through nine provinces, autonomous regions and cities, and ends at Shanghai. With a total length of 3,371km, it is the longest natural gas pipeline with the largest diameter and highest pressure in China. 


It is likely Smart Gas Meters will be widely deployed in Russia 


According to local news from Russia, The Russian vice President of energy proposed to introduce smart gas metering and collection system, referring to the application of smart meters. 

Since Russia nature gas is supplied by national gas pipeline network, it is likely that smart gas meters will be widely used in Russia. 

Further research on this topic will be conducted locally in the near future.


1.png